Reading and comparing a renovation quote in the Netherlands, line by line

Two quotes for the same bathroom can be far apart without either being too expensive or too cheap. Often they simply describe different work. One includes demolition, waste removal and levelling, the other does not. One gives a fixed price, the other an estimate with provisional sums. This guide helps you read a Dutch quote (offerte) line by line and put two quotes side by side fairly.

Stas, Parus Construction6 min readChecked against official sources5,0 · 21 Google reviews
Reading and comparing a renovation quote in the Netherlands, line by line
In short
  • Compare the description of the work first, and only then the price.
  • A fixed price is not the same as an estimate. With an estimate, extra work can be charged.
  • Provisional sums (stelposten) are estimated amounts for items not yet chosen.
  • Where different VAT rates apply, the quote should split them.
  • Planning, payment stages and terms belong in the quote too.

Start with the description

The price is usually at the bottom, but the important part is above it. A good quote describes what will be done, with which materials and to what level of finish. "Renovate bathroom" in one line says little. "Remove and dispose of existing tiles and sanitary ware, waterproof the walls, wall tiles to the ceiling, concealed cistern with wall-hung toilet" says much more.

Put the quotes side by side and tick off each item. If something is missing from one quote, its low price may not really be low. ACM ConsuWijzer, the Dutch consumer authority, puts it this way in its quote checklist: compare the terms as well as the price.

Also look at quantities. Does the quote say how many square metres of wall will be plastered or tiled, how many sockets are added and how many metres of pipe are replaced? Without quantities you cannot check whether two firms assume the same space. A few square metres of difference in a bathroom tiled to the ceiling soon adds up. If in doubt, ask for a floor plan or sketch showing what will be done. That also helps later, when you want to check during the work whether something was agreed or not.

  • Demolition and removal of rubble and old materials.
  • Preparing the substrate, such as levelling or plastering.
  • Plumbing and electrics: how many points, where and in which material.
  • Finishing: tiles to what height, sealant, skirting, painting.
  • Cleaning up and a clean handover.

Fixed price or estimate

This difference decides what you pay if the job turns out harder. According to ACM ConsuWijzer, with a fixed price you usually pay nothing extra, even when the work is more difficult than expected. If there is less work, the contractor does not have to lower the price either.

An estimate (richtprijs) is a best guess. The contractor must warn you in time if it will cost more. If they do, you pay for the extra work. If they do not warn you in time, ACM ConsuWijzer says they may charge at most 10 percent more. If there is less work, you only pay for the hours and materials actually used.

Type of priceJob turns out harderJob turns out easier
Fixed priceUsually no extra costPrice does not have to go down
Estimate, warned in timeYou pay for the extra workYou pay actual hours and materials
Estimate, not warned in timeAt most 10 percent extraYou pay actual hours and materials

Provisional sums and open choices

A provisional sum (stelpost) is an estimated amount for something not yet chosen, such as tiles, sanitary ware or a tap. It is useful if you want to choose later, but it makes comparison harder. A quote with low provisional sums looks cheaper, while the final price rises once you choose what you really want.

So ask, for each provisional sum, what that amount buys and what happens if you choose something more or less expensive. Is the difference settled? With or without a mark-up? The fewer provisional sums, the firmer the price. At Parus we prefer to choose the materials with you before the quote is final.

Tip from the trade: Put the provisional sums of two quotes side by side. If one allows half as much for tiles as the other, ask which kind of tile it assumes.

★★★★★
Snel en kwalitatief hoogstaand werk. 3 kamers opgeleverd in 3 dagen. Gestuukte wanden en plafond. Nu zijn de kamers onherkenbaar. Zulke gladde muren waren hier nooit. Ik adviseer iedereen Parus Construction. Ook de prijzen zullen u verrassen.
Anastasija Martinova, Google review (in Dutch)

Extra work: when do you pay more

Extra work (meerwerk) is work that is not in the quote. Sometimes it comes from a change you want, sometimes from something uncovered during demolition, such as a rotten joist or an old pipe. According to ACM ConsuWijzer, the contractor must warn you before the extra work causes costs. If they do not, or do so too late, in many cases you do not have to pay for it.

A good quote says up front how extra work is agreed: in writing, with a price, before it is done. Ask about it if it is missing. In an older home it is wise to discuss the risks beforehand, for example in the floor, the pipework or asbestos in homes built before 1994.

Do not forget reduced work (minderwerk). If you decide halfway to drop an item or do it yourself, ACM ConsuWijzer says that with a fixed price the contractor does not have to lower the price unless that was agreed. With an estimate you only pay for what was actually done. A good quote therefore also says how reduced work is settled. Record every change, more or less, in a short email with the description and the amount, and keep it with the quote.

VAT on the quote

In the Netherlands some work on homes older than two years carries 9 percent VAT (btw) instead of 21 percent. According to the Belastingdienst, the Dutch tax authority, this covers insulating, painting, plastering and wallpapering. For insulation the low rate applies to labour only. For painting and plastering it covers materials too.

If a contractor combines work at 21 and 9 percent, the tax authority says they must split it in the quote and invoice. Check that the quotes you compare are both including or both excluding VAT. Read more in our guide to VAT and subsidies for renovation.

Planning, payment and terms

A quote without planning is only half a quote. Ask when work can start, how long it takes and what the delivery times for materials are. One contractor saying two weeks for a full bathroom and another saying four may be working with different drying times. That is no detail: tiling too soon on a damp surface causes cracks later.

Also look at the payment stages, the size of any deposit, the guarantee and the general terms. Ask whether the firm belongs to a disputes committee. Only sign when you understand everything. A question costs nothing now, an unclear agreement costs a lot later.

How to compare fairly

Make a simple table with, for each quote, the items, the type of price, the provisional sums, the VAT, the planning and the payment stages. Fill in the gaps by asking. Only when the descriptions match does the price difference mean something. Often the cheapest quote turns out to cover less work, or the most expensive one solves a problem the other missed.

At Parus the quote follows a site visit, with all work written out. Read the free site visit: what happens for what that involves, and what determines renovation cost for what drives the price. Want to put our quote next to another one? Get in touch. You will hear from us within 24 hours.

Frequently asked questions

What is the difference between an offerte and a prijsopgave?

In practice the two Dutch words are used interchangeably. What matters is whether the quote gives a fixed price or an estimate, and how the work is described.

Is the cheapest quote the best?

Not necessarily. First check that the work is described the same way. A cheaper quote often covers less work or has lower provisional sums.

Can a contractor charge extra on a fixed price?

With a fixed price, ACM ConsuWijzer says you usually pay nothing extra. You may have to pay if you change the job yourself and could have understood that it costs more.

What is a stelpost?

An estimated amount for an item not yet chosen, such as tiles or sanitary ware. Ask what that amount buys and how any difference is settled.

How long is a quote valid?

That is usually stated in the quote. Ask if it is not, because material prices and planning can change.

Stas, owner of Parus Construction

Renovation and finishing work from Roelofarendsveen: plastering, bathrooms, microcement, extensions, insulation, floors, electrics and plumbing. One point of contact from quote to completion. Questions? Call or WhatsApp +31 6 87 61 60 78.

Sources

  1. Checklist for comparing quotes (ACM ConsuWijzer, in Dutch)
  2. What do I pay if more or less work is done? (ACM ConsuWijzer, in Dutch)
  3. VAT rate for work on homes older than 2 years (Belastingdienst, in Dutch)

Rules change. Always check your own address with the Permit Check (Vergunningcheck) in the Omgevingsloket or with your municipality.

5,0· 21 Google reviews

Vraag uw gratis offerte aan

Liever direct persoonlijk contact? Bel of app ons, we helpen u graag op weg.

  • Vrijblijvend en kosteloosEen offerte zonder verplichtingen of verborgen kosten.
  • Reactie binnen 24 uurWe nemen binnen 24 uur contact met u op.
  • Eén aanspreekpuntVan offerte tot oplevering heeft u één vast contactpersoon.

Optioneel

Vrijblijvend en kosteloos. Reactie binnen 24 uur.