In Amsterdam three layers decide whether an extension, dormer or renovation needs a permit: the national exemptions in the Buildings Decree, the City of Amsterdam environment plan, and the protection of the historic centre and other areas. Behind an ordinary house outside the centre a lot is permit free. In the canal ring almost nothing is. This page explains how it works and how to check your own address.
- A rear dormer is permit free if it meets Bbl article 2.29(b), except on a listed building or in a state protected area.
- An extension in the rear yard can be permit free under the national dowry rules (articles 22.27 and 22.36), but Amsterdam has its own deviating rules for the Oost, Zuid and West districts.
- The city centre inside the Singelgracht is a state protected townscape, and the city has designated further protected areas of its own.
First: technical and planning rules
Under the Environment and Planning Act (Omgevingswet) every building plan has a technical part, checked against the Buildings Decree (Besluit bouwwerken leefomgeving, or Bbl), and a planning part, checked against the municipality's environment plan (omgevingsplan). Permit free does not mean rule free: the Bbl and the neighbour rules in the Civil Code always apply. This page explains how it works in Amsterdam. It is not permit advice: only the online permit check or the municipality (gemeente) can confirm what applies to your address.
Extensions: the national rules
On the technical side, a side or rear extension is permit free if it stands on the ground, is no higher than 5 metres, has no habitable room on the second storey and no roof terrace or balcony (Bbl article 2.25).
On the planning side the dowry rules (bruidsschat) apply: national rules copied into every environment plan in 2024. The extension must be in the rear yard area, starting 1 metre behind the front facade, and more than 1 metre from public space (article 22.27). Within the article 22.36 limits below it can ignore the old zoning plan. Municipalities may change these rules.
| Situation | Condition |
|---|---|
| Within 4 m of the original house | At most 5 m high and at most 0.3 m above the first floor level |
| More than 4 m from the house | At most 3 m high, or a pitched roof with a ridge up to 5 m |
| Total area of annexes | At most half of a plot area up to 100 m², never more than 150 m² |
| Listed building or state protected area | Permit needed (article 22.28); in a protected area not in the yard behind the house, out of public view |
Dormers and roof windows
A dormer (dakkapel) is always permit free technically (Bbl article 2.27(2)(a)); a full roof extension is not. On the planning side, a dormer on the rear slope, or a side slope not facing public space, is free under Bbl article 2.29(b), which overrides the environment plan. The conditions are listed below.
At the front, a dormer is only free where no design requirements (welstand) apply (dowry article 22.27(c)). A roof window is free on the rear slope or a flat roof if it sticks out no more than 0.6 metres and stays 0.5 metres from the edges (Bbl article 2.29(c)). On a listed building, and in a state protected area on a slope facing public space, you need a permit (Bbl article 2.30).
- Flat roof.
- No higher than 1.75 m.
- Bottom more than 0.5 m and less than 1 m above the eaves.
- Top more than 0.5 m below the ridge.
- Sides more than 0.5 m from the edge of the roof slope.
Renovating inside the house
Internal work is permit free as long as the load bearing structure and fire compartments stay the same (Bbl article 2.27) and the building volume does not grow (dowry article 22.27(i)). A new bathroom or kitchen usually falls under this. If you remove a load bearing wall, IPLO, the government's information point for the Act, says you need a permit for the technical building activity. In a national monument (rijksmonument) even internal work often needs a monument permit. Normal maintenance stays free.
Tip from the trade: Have a structural engineer calculate a new steel beam before anything is demolished.
Ze hebben in 1 week tijd de hele beneden verdieping stucwerk gerepareerd, geschilderd en gesausd tot volle tevredenheid. Netjes en accuraat gewerkt, flexibel geweest en vakwerk afgeleverd. Dus top.
What the Amsterdam environment plan adds
Amsterdam has a single environment plan for the whole city (Omgevingsplan gemeente Amsterdam). It contains the old zoning plans, the national dowry rules and a basic set of rules the city wrote itself. For anything outside the national exemptions, that plan decides plot by plot whether an extension is possible, how deep and how high. It also sets the conditions for a dormer on the front slope or on a side slope facing the street.
For the Oost, Zuid and West districts the city has a separate page with deviating rules (Dutch), covering dormers, roof terraces and extensions among other things. If you live in one of those districts, read that page first. If your plan does not fit the environment plan, the city advises a preliminary request (conceptverzoek, Dutch page). It is checked against the plan and design rules, so you know where you stand before paying for full drawings. For an extension we go through this at the first visit.
Design review, protected areas and listed buildings in Amsterdam
Design review (welstand: the check that a building looks right in its setting) is done by the Commissie Omgevingskwaliteit. It uses the design guide De Schoonheid van Amsterdam, with separate chapters for dormers and extensions. A plan that follows a pattern already found in the block can often be assessed quickly.
The city centre inside the Singelgracht is a state protected townscape (rijksbeschermd stadsgezicht), and the canal ring is a UNESCO World Heritage Site. There, Bbl article 2.30 and dowry article 22.28 apply. In that area, expect a permit for almost any visible change. The city has also designated protected areas of its own, such as the Admiralenbuurt, Betondorp and Oud Zuid in 2022 and Plan Van Gool in 2024. Their rules are in the environment plan and the city's heritage bylaw.
Amsterdam has thousands of national monuments (rijksmonumenten) and many municipal ones. You can check your building in the national monuments register of the Cultural Heritage Agency (RCE).
Owners' associations and renting
A permit only means the government agrees. In a flat, the facade, roof and usually the load bearing walls belong to the owners' association (Vereniging van Eigenaren, or VvE). A dormer, extension or new opening then needs a VvE decision under the deed of division (splitsingsakte). The municipality does not check this.
If you rent, you need the landlord's consent for an extension, dormer, kitchen or bathroom. The landlord must reply within 8 weeks and may only refuse if the home becomes harder to let or loses value (Civil Code article 7:215).
How to check it yourself
Start from your own address. The national portal is in Dutch and you need a DigiD login to apply; a browser translation is usually enough to follow the questions.
If you get stuck, call the city on 14 020. Newcomers can also ask IN Amsterdam. If you want to know what is possible structurally, contact us for a visit by Stas. For larger work, such as a full renovation, we include the permit question in the planning.
- Read the city's English page on construction and renovation permits.
- Run the permit check on the Omgevingsloket. Pick the right activity for each part, such as placing a dormer or renovating an existing building.
- Look up the rules for your plot in Rules on the map.
- Read the Dutch pages on the environment permit and, if you live in Oost, Zuid or West, the deviating rules.
- Check your address in the national monuments register and on the RCE map of protected areas.
Frequently asked questions
Can I add a rear dormer in Amsterdam without a permit?
Yes, if it meets the five conditions of Bbl article 2.29(b) and the building is not listed. In a state protected townscape a dormer on a slope facing public space does need a permit. In a flat you also need your owners' association to agree.
Do the national dowry rules apply in Amsterdam?
Yes, they are part of the Amsterdam environment plan. The city may change them and has deviating rules for Oost, Zuid and West. Always check Rules on the map for your address.
Do I need a permit for a new bathroom in the city centre?
If the structure stays the same and the building is not listed, a new bathroom is usually permit free, even in the centre. If the building is a national or municipal monument, internal work can need a permit too.
How long does a permit take in Amsterdam?
The standard procedure has a national decision period of 8 weeks, which can be extended once by 6 weeks. A preliminary request adds time but often prevents a refusal.
Renovation and finishing work from Roelofarendsveen: plastering, bathrooms, microcement, extensions, insulation, floors, electrics and plumbing. One point of contact from quote to completion. Questions? Call or WhatsApp +31 6 87 61 60 78.
Sources
- Construction and renovation permit (City of Amsterdam)
- Environment permit (City of Amsterdam, Dutch)
- Deviating rules Oost, Zuid and West (City of Amsterdam, Dutch)
- IN Amsterdam
- What the Environment and Planning Act means for residents (Government.nl)
- Permit free annexes and extensions (IPLO, Dutch)
- Permit free dormers (IPLO, Dutch)
- Permit free roof windows (IPLO, Dutch)
- Permit or notification for the technical building activity (IPLO, Dutch)
- Buildings Decree, Bbl (wetten.overheid.nl, Dutch)
- Permit check (Omgevingsloket, Dutch)
- Rules on the map (Omgevingsloket, Dutch)
- Renovating a rented home (Rijksoverheid, Dutch)
- National monuments register (RCE, Dutch)
Rules change. Always check your own address with the Permit Check (Vergunningcheck) in the Omgevingsloket or with your municipality.



